Located at Expo City Dubai, the Dubai Exhibition Centre Phase 2 expansion represents a significant advancement in world-class exhibition and event infrastructure, delivering highly flexible spaces designed to accommodate international exhibitions, conferences, and large-scale events. Building on the successful completion of Phase 1, GIBCA was entrusted with the complete design, supply, and installation of 21 Hufcor Series 641 operable walls, featuring advanced acoustic performance, custom-engineered structural movement solutions, and sophisticated finishes to transform the North and South Halls into versatile, acoustically separated event spaces.


Dubai Exhibition Centre, Dubai, UAE
Dubai Exhibition Centre Phase 2
Design Partner: Woods Bagot
The Dubai Exhibition Centre Exhibition Halls Extension Phase 2 required large-scale spaces that could adapt to different event sizes and formats. Following the success and satisfaction with our work on Phase 1 in 2020, we were tasked with the complete design, supply and installation of 21 Hufcor Series 641 operable walls across the North and South Halls, allowing the venue to create multiple acoustically separated spaces for simultaneous events.
The halls needed to accommodate a range of layouts, including combinations of different-sized event spaces, while controlling sound transfer between them. Achieving this flexibility with panels approximately 14 metres tall and weighing between 650 and 750 kg required careful engineering of the partitions, seals and overhead suspension system.
Building movement presented a significant challenge. The sealing system needed to accommodate up to 280 mm of live-load deflection, while track junctions and turns had to allow movement of up to 165 mm without compromising panel support or travel. These requirements had to work across a complex, multidirectional track layout.
The client also required durable finishes with eight distinct patterns distributed across more than 1,300 panels. Coordinating the finishes, panel positioning and installation sequence was essential, particularly as manufacturing and site installation needed to progress in parallel.
Gibca Furniture delivered a coordinated partition and track system using Hufcor Series 641 operable walls with an STC 54 acoustic rating. The completed installation comprises 1,353 panels across 21 partitions: 12 partitions with 822 panels in the South Hall and nine partitions with 531 panels in the North Hall. This arrangement allows the halls to be subdivided into different configurations to suit individual event requirements.
To address structural movement, we incorporated a custom-engineered deep bottom seal system developed for DEC Phase 1, capable of accommodating up to 280 mm of live-load deflection. The overhead track design included more than 20 expansion joints, with junctions and turns engineered to extend and retract by up to 165 mm while supporting the heavy panels and accommodating movement in multiple directions.
Special pass doors provided access between divided spaces, with hold-open features, panic mechanisms and high-pressure seals that removed the need for floor bolts. These details supported flexible layouts and practical day-to-day operation.
The panel finishes combined micro-perforation for acoustic purposes with custom-printed vinyl and painted steel lower sections. Eight patterns were coordinated across the panel arrangement, with design, manufacturing and site teams working closely to maintain the intended appearance throughout production and installation. Manufacturing at our 30,000-square-metre factory progressed alongside site installation, enabling the team to coordinate production and delivery with the sequence of works on site.